Safer, compliant power for modern homes and businesses.
Upgrading your switchboard is essential for safety, compliance and the reliable operation of modern appliances. Key reasons an upgrade may be necessary:
Yes, if any of the following apply:
Our standard upgrade includes:
Most switchboard upgrades take approximately 4–5 hours to complete. During this time you will not have power.
Some older homes have main supply cables sized at 6mm² to 10mm², which only allow a maximum current draw of 40A (for 6mm²) or 50A (for 10mm²). This is often insufficient for modern high-demand appliances such as electric ovens, air conditioning systems or electric hot water units.
You may need a consumer mains upgrade if:
“Prompt, thorough and available for follow-up queries. I'm happy to have chosen Future Green Energies for my future electrical needs and services. Thank you.”
“I needed a switchboard upgrade and Future Green Energies was great at communicating my options and extremely well priced. Came and completed the job to a great standard and left everything neat and tidy. Highly recommend.”